ionitor says:
So, I was scheduling a task today (March 31st), and I put in "1 month" for the due date. The result was a due date of May 31! Similarly, putting in "3 months" gave me July 31. It looks like, if the due date would be on the 31st of a month that doesn't have a 31st, the next month is used. I'm not sure what the right answer is (the 30th of the same month or the 1st of the next month), but that isn't it!
Posted at 8:24pm on March 31, 2013
brendan says:
Hi ionitor,
That's right, if you specify a due date of "1 month" on the 31st and the next month does not have 31 days, the due date will automatically be set to the next month with 31 days. Sorry for the confusion on this.

Thanks for your feedback on the expected behavior. I'll pass this along to the development team.
Posted 10 years ago